GTT Wins Order from Korean Shipyard
At the end of 2017, GTT received an order from a South Korean shipyard regarding the design of the LNG tanks of a new LNG carrier. Its delivery is scheduled for the first quarter of 2020.
GTT will design the LNG tanks of the unit, allowing for a capacity of 174,000 m3. The insulation solution Mark III Flex has been chosen for its ability to reduce the daily guaranteed Boil-Off gas rate to 0.085 percent of tank volume. 48 vessels in service already benefit from this technology.
The shipowner and shipyard's names are kept confidential at this stage.
The products and services herein described in this press release are not endorsed by The Maritime Executive.