GTT Receives New Order from DSME for LNG Carrier Tank Design
GTT received an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME) for the tank design of an LNG carrier (LNGC) offering a capacity of 173,400 m3. This unit will be built on behalf of a European ship-owner.
The tanks will be fitted with the NO96 GW technology and the vessel's delivery is expected by end 2020.
The products and services herein described in this press release are not endorsed by The Maritime Executive.