1085
Views

NYPA Launches DANIEL JONCAIRE II Tug

DANNIEL JONCAIRE II Tug

Published Oct 27, 2015 4:17 PM by The Maritime Executive

Bristol Harbor Group, Inc. (BHGI) is pleased to announce the launching of the DANIEL JONCAIRE II, 45’ twin-screw tug for the New York Power Authority (NYPA). BHGI was awarded a contract by NYPA to engineer, design and perform construction supervision support services for two new tug vessels. In 2009, BHGI was involved in the design/build process for NYPA’s new barge, the HAVASU II, which led to a study that compared and contrasted the initial and long-term costs to repair and update their existing tugs, or replace them. The analysis led to NYPA deciding to replace the DANIEL JONCAIRE and the B-1 BREAKER. The new tug was built at Great Lakes Shipyard located in Cleveland, Ohio. The vessel was designed and built to comply with proposed Subchapter M of Title 46 of the Code of Federal Regulations for inspected towing vessels.

The tugs will be used primarily for deployment, retrieval and maintenance of an ice boom annually installed near the outlet of Lake Erie to help protect NYPA’s hydroelectric plant intakes on the Niagara River from heavy ice flows. The vessels will be specially reinforced for operations in seasonal ice. The vessels employ heavy stems for light ice breaking and shell reinforcement along the ice belt. The JONCAIRE II also features an elevated pilothouse for improved visibility when maneuvering as well as a spacious work deck aft to facilitate boom connections.

JONCAIRE II’s sister vessel is to be fabricated and delivered in 2017 in order to give NYPA an opportunity to operate the first vessel and incorporate any changes they feel would improve the tug or its capabilities. BHGI will continue to provide construction supervision services for the second tug.

The products and services herein described in this press release are not endorsed by The Maritime Executive.