Distortion Control Toolbox Project

By MarEx 2013-01-14 14:10:00

 

This project compiles the physics and principles associated with dis- tortion control derived from previous research, and converts this knowledge base into a sequenced set of tangible, “shipyard friend- ly” implementation solutions designed to optimize several shipyard models. Distortion control modules will be designed and imple- mented to reduce the production rework associated with construc- tion of lightweight ship structures. These modules will address the major sources of distortion, to include the welding and material handling processes. This project raises the technology readiness level of distortion control techniques to enable shipyard implemen- tation.

 

Workshop Agenda (a.m.)

9:00 Overview Distortion Control Toolbox

Project 9:15 Current State Report

(MS 5) 9:45 Distortion Mitigation

Report (MS 7) 10:10 Break

10:20 Ideal State Shipyard Scenarios (MS 12)

10:50 Wrap Up

For More Information: Contact Lisa Hepinstall ♦ (904) 504—8335 ♦ lisa@hepinstallgroup.com

The products and services herein described in this press release are not endorsed by The Maritime Executive.